The Kubernetes API Server should enable audit logs on its server

kubernetes

Classification:

compliance

Framework:

cis-kubernetes

Control:

1.2.22

Set up the kubernetes integration.

Description

Enable auditing on the Kubernetes API Server and set the desired audit log path.

Rationale

Auditing the Kubernetes API Server provides a security-relevant chronological set of records documenting the sequence of activities that have affected system by individual users, administrators or other components of the system. Even though currently, Kubernetes provides only basic audit capabilities, it should be enabled. You can enable it by setting an appropriate audit log path.

Audit

Run the following command on the master node:

ps -ef | grep kube-apiserver

Verify that the --audit-log-path argument is set as appropriate.

Remediation

Edit the API server pod specification file /etc/kubernetes/manifests/kube-apiserver.yaml on the master node and set the –audit-log-path parameter to a suitable path and file where you would like audit logs to be written, for example: –audit-log-path=/var/log/apiserver/audit.log

Impact

None

Default value

By default, auditing is not enabled.

References

  1. https://kubernetes.io/docs/admin/kube-apiserver/ 2. https://kubernetes.io/docs/concepts/cluster-administration/audit/ 3. https://github.com/kubernetes/features/issues/22

CIS controls

Version 6 6.2 Ensure Audit Log Settings Support Appropriate Log Entry Formatting Validate audit log settings for each hardware device and the software installed on it, ensuring that logs include a date, timestamp, source addresses, destination addresses, and various other useful elements of each packet and/or transaction. Systems should record logs in a standardized format such as syslog entries or those outlined by the Common Event Expression initiative. If systems cannot generate logs in a standardized format, log normalization tools can be deployed to convert logs into such a format. Version 7 6.2 Activate audit logging Ensure that local logging has been enabled on all systems and networking devices. 6.3 Enable Detailed Logging Enable system logging to include detailed information such as an event source, date, user, timestamp, source addresses, destination addresses, and other useful elements.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers