The misconfigured resource should retain at least 10 log file rotations

kubernetes

Classification:

compliance

Framework:

cis-kubernetes

Control:

1.2.24

Set up the kubernetes integration.

Description

Retain 10 or an appropriate number of old log files.

Rationale

Kubernetes automatically rotates the log files. Retaining old log files ensures that you would have sufficient log data available for carrying out any investigation or correlation. For example, if you have set file size of 100 MB and the number of old log files to keep as 10, you would approximate have 1 GB of log data that you could potentially use for your analysis.

Audit

Run the following command on the master node:

ps -ef | grep kube-apiserver

Verify that the --audit-log-maxbackup argument is set to 10 or as appropriate.

Remediation

Edit the API server pod specification file /etc/kubernetes/manifests/kube-apiserver.yaml on the master node and set the --audit-log-maxbackup parameter to 10 or to an appropriate value: --audit-log-maxbackup=10

Impact

None

Default value

By default, auditing is not enabled.

References

  1. https://kubernetes.io/docs/admin/kube-apiserver/
  2. https://kubernetes.io/docs/concepts/cluster-administration/audit/
  3. https://github.com/kubernetes/features/issues/22

CIS controls

Version 6 6.3 Ensure Audit Logging Systems Are Not Subject To Loss (i.e. rotation/archive) Ensure that all systems that store logs have adequate storage space for the logs generated on a regular basis, so that log files will not fill up between log rotation intervals. The logs must be archived and digitally signed on a periodic basis. Version 7 6.4 Ensure adequate storage for logs Ensure that all systems that store logs have adequate storage space for the logs generated.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers