NPM NPM PyPI PyPI Go License

Use this Datadog CDK Construct Library to deploy serverless applications using AWS CDK .

This CDK library automatically configures ingestion of metrics, traces, and logs from your serverless applications by:

  • Installing and configuring the Datadog Lambda layers for your .NET, Java, Node.js, and Python Lambda functions.
  • Enabling the collection of traces and custom metrics from your Lambda functions.
  • Managing subscriptions from the Datadog Forwarder to your Lambda and non-Lambda log groups.

AWS CDK v1 vs AWS CDK v2

WARNING: AWS CDK v1 has reached end-of-support and datadog-cdk-constructs will no longer be receiving updates. It’s strongly recommended to upgrade to AWS CDK v2 (official migration guide) and switch to using datadog-cdk-constructs-v2.

Two separate versions of Datadog CDK Constructs exist; datadog-cdk-constructs and datadog-cdk-constructs-v2. These are designed to work with AWS CDK v1 and AWS CDK v2 respectively.

  • datadog-cdk-constructs-v2 requires Node >= 14, while datadog-cdk-constructs supports Node >= 12.
  • datadog-cdk-constructs-v2 contains more features.
  • Otherwise, the use of the two packages is identical.

Lambda

Package Installation

npm

For use with AWS CDK v2:

yarn add --dev datadog-cdk-constructs-v2
# or
npm install datadog-cdk-constructs-v2 --save-dev

For use with AWS CDK v1:

yarn add --dev datadog-cdk-constructs
# or
npm install datadog-cdk-constructs --save-dev

PyPI

For use with AWS CDK v2:

pip install datadog-cdk-constructs-v2

For use with AWS CDK v1:

pip install datadog-cdk-constructs
Note:

Pay attention to the output from your package manager as the Datadog CDK Construct Library has peer dependencies.

Go

For use with AWS CDK v2:

go get github.com/DataDog/datadog-cdk-constructs-go/ddcdkconstruct/v2

AWS CDK v1 is not supported.

Usage

AWS CDK

The following examples assume the use of AWS CDK v2. If you’re using CDK v1, import datadog-cdk-constructs rather than datadog-cdk-constructs-v2.

Add this to your CDK stack:

TypeScript

import { DatadogLambda } from "datadog-cdk-constructs-v2";

const datadogLambda = new DatadogLambda(this, "datadogLambda", {
  nodeLayerVersion: <LAYER_VERSION>,
  pythonLayerVersion: <LAYER_VERSION>,
  javaLayerVersion: <LAYER_VERSION>,
  dotnetLayerVersion: <LAYER_VERSION>
  addLayers: <BOOLEAN>,
  extensionLayerVersion: "<EXTENSION_VERSION>",
  forwarderArn: "<FORWARDER_ARN>",
  createForwarderPermissions: <BOOLEAN>,
  flushMetricsToLogs: <BOOLEAN>,
  site: "<SITE>",
  apiKey: "{Datadog_API_Key}",
  apiKeySecretArn: "{Secret_ARN_Datadog_API_Key}",
  apiKeySecret: <AWS_CDK_ISECRET>, // Only available in datadog-cdk-constructs-v2
  apiKmsKey: "{Encrypted_Datadog_API_Key}",
  enableDatadogTracing: <BOOLEAN>,
  enableMergeXrayTraces: <BOOLEAN>,
  enableDatadogLogs: <BOOLEAN>,
  injectLogContext: <BOOLEAN>,
  logLevel: <STRING>,
  env: <STRING>, //Optional
  service: <STRING>, //Optional
  version: <STRING>, //Optional
  tags: <STRING>, //Optional
});
datadogLambda.addLambdaFunctions([<LAMBDA_FUNCTIONS>])
datadogLambda.addForwarderToNonLambdaLogGroups([<LOG_GROUPS>])

Go

import (
	"github.com/DataDog/datadog-cdk-constructs-go/ddcdkconstruct/v2"
)
datadogLambda := ddcdkconstruct.NewDatadogLambda(
    stack,
    jsii.String("Datadog"),
    &ddcdkconstruct.DatadogLambdaProps{
        NodeLayerVersion:      jsii.Number(<LAYER_VERSION>),
        AddLayers:             jsii.Bool(<BOOLEAN>),
        Site:                  jsii.String(<SITE>),
        ApiKey:                jsii.String(os.Getenv("DD_API_KEY")),
        // ...
    })
datadogLambda.AddLambdaFunctions(&[]interface{}{myFunction}, nil)
datadogLambda.AddForwarderToNonLambdaLogGroups()

Source Code Integration

Source code integration is enabled by default through automatic lambda tagging, and will work if:

  • The Datadog Github integration is installed.
  • Your datadog-cdk dependency satisfies either of the below versions:
    • datadog-cdk-constructs-v2 >= 1.4.0
    • datadog-cdk-constructs >= 0.8.5

Alternative Methods to Enable Source Code Integration

If the automatic implementation doesn’t work for your case, please follow one of the two guides below.

Note: these alternate guides only work for Typescript.

datadog-cdk version satisfied, but Datadog Github integration NOT installed

If the Datadog Github integration is not installed, you need to import the datadog-ci package and manually upload your Git metadata to Datadog. For the best results, import the datadog-ci package where your CDK Stack is initialized.

const app = new cdk.App();

// Make sure to add @datadog/datadog-ci via your package manager
const datadogCi = require("@datadog/datadog-ci");
// Manually uploading Git metadata to Datadog.
datadogCi.gitMetadata.uploadGitCommitHash("{Datadog_API_Key}", "<SITE>");

const app = new cdk.App();
new ExampleStack(app, "ExampleStack", {});

app.synth();
datadog-cdk version NOT satisfied

Change your initialization function as follows (in this case, gitHash value is passed to the CDK):

async function main() {
  // Make sure to add @datadog/datadog-ci via your package manager
  const datadogCi = require("@datadog/datadog-ci");
  const [, gitHash] = await datadogCi.gitMetadata.uploadGitCommitHash("{Datadog_API_Key}", "<SITE>");

  const app = new cdk.App();
  // Pass in the hash to the ExampleStack constructor
  new ExampleStack(app, "ExampleStack", {}, gitHash);
}

Ensure you call this function to initialize your stack.

In your stack constructor, change to add an optional gitHash parameter, and call addGitCommitMetadata():

export class ExampleStack extends cdk.Stack {
  constructor(scope: cdk.App, id: string, props?: cdk.StackProps, gitHash?: string) {
    ...
    ...
    datadogLambda.addGitCommitMetadata([<YOUR_FUNCTIONS>], gitHash)
  }
}

Configuration

To further configure your DatadogLambda construct for Lambda, use the following custom parameters:

Note: The descriptions use the npm package parameters, but they also apply to PyPI and Go package parameters.

npm package parameterPyPI package parameterDescription
addLayersadd_layersWhether to add the runtime Lambda Layers or expect the user to bring their own. Defaults to true. When true, the Lambda Library version variables are also required. When false, you must include the Datadog Lambda library in your functions’ deployment packages.
pythonLayerVersionpython_layer_versionVersion of the Python Lambda layer to install, such as 83. Required if you are deploying at least one Lambda function written in Python and addLayers is true. Find the latest version number here. Warning: This parameter and pythonLayerArn are mutually exclusive. If used, only set one or the other.
pythonLayerArnpython_layer_arnThe custom ARN of the Python Lambda layer to install. Required if you are deploying at least one Lambda function written in Python and addLayers is true. Warning: This parameter and pythonLayerVersion are mutually exclusive. If used, only set one or the other.
nodeLayerVersionnode_layer_versionVersion of the Node.js Lambda layer to install, such as 100. Required if you are deploying at least one Lambda function written in Node.js and addLayers is true. Find the latest version number from here. Warning: This parameter and nodeLayerArn are mutually exclusive. If used, only set one or the other.
nodeLayerArnnode_layer_arnThe custom ARN of the Node.js Lambda layer to install. Required if you are deploying at least one Lambda function written in Node.js and addLayers is true. Warning: This parameter and nodeLayerVersion are mutually exclusive. If used, only set one or the other.
javaLayerVersionjava_layer_versionVersion of the Java layer to install, such as 8. Required if you are deploying at least one Lambda function written in Java and addLayers is true. Find the latest version number in the Serverless Java installation documentation. Note: extensionLayerVersion >= 25 and javaLayerVersion >= 5 are required for the DatadogLambda construct to instrument your Java functions properly. Warning: This parameter and javaLayerArn are mutually exclusive. If used, only set one or the other.
javaLayerArnjava_layer_arnThe custom ARN of the Java layer to install. Required if you are deploying at least one Lambda function written in Java and addLayers is true. Warning: This parameter and javaLayerVersion are mutually exclusive. If used, only set one or the other.
dotnetLayerVersiondotnet_layer_versionVersion of the .NET layer to install, such as 13. Required if you are deploying at least one Lambda function written in .NET and addLayers is true. Find the latest version number from here. Warning: This parameter and dotnetLayerArn are mutually exclusive. If used, only set one or the other.
dotnetLayerArndotnet_layer_arnThe custom ARN of the .NET layer to install. Required if you are deploying at least one Lambda function written in .NET and addLayers is true. Warning: This parameter and dotnetLayerVersion are mutually exclusive. If used, only set one or the other. .
extensionLayerVersionextension_layer_versionVersion of the Datadog Lambda Extension layer to install, such as 5. When extensionLayerVersion is set, apiKey (or if encrypted, apiKMSKey or apiKeySecretArn) needs to be set as well. When enabled, lambda function log groups will not be subscribed by the forwarder. Learn more about the Lambda extension here. Warning: This parameter and extensionVersionArn are mutually exclusive. Set only one or the other. Note: If this parameter is set, it adds a layer even if addLayers is set to false.
extensionLayerArnextension_layer_arnThe custom ARN of the Datadog Lambda Extension layer to install. When extensionLayerArn is set, apiKey (or if encrypted, apiKMSKey or apiKeySecretArn) needs to be set as well. When enabled, lambda function log groups are not subscribed by the forwarder. Learn more about the Lambda extension here. Warning: This parameter andextensionLayerVersion are mutually exclusive. If used, only set one or the other. Note: If this parameter is set, it adds a layer even if addLayers is set to false.
forwarderArnforwarder_arnWhen set, the plugin automatically subscribes the Datadog Forwarder to the functions’ log groups. Do not set forwarderArn when extensionLayerVersion or extensionLayerArn is set.
createForwarderPermissionscreateForwarderPermissionsWhen set to true, creates a Lambda permission on the the Datadog Forwarder per log group. Since the Datadog Forwarder has permissions configured by default, this is unnecessary in most use cases.
flushMetricsToLogsflush_metrics_to_logsSend custom metrics using CloudWatch logs with the Datadog Forwarder Lambda function (recommended). Defaults to true . If you disable this parameter, it’s required to set apiKey (or if encrypted, apiKMSKey or apiKeySecretArn).
sitesiteSet which Datadog site to send data. This is only used when flushMetricsToLogs is false or extensionLayerVersion or extensionLayerArn is set. Possible values are datadoghq.com, datadoghq.eu, us3.datadoghq.com, us5.datadoghq.com, ap1.datadoghq.com, and ddog-gov.com. The default is datadoghq.com.
apiKeyapi_keyDatadog API Key, only needed when flushMetricsToLogs is false or extensionLayerVersion or extensionLayerArn is set. For more information about getting a Datadog API key, see the API key documentation.
apiKeySecretArnapi_key_secret_arnThe ARN of the secret storing the Datadog API key in AWS Secrets Manager. Use this parameter in place of apiKey when flushMetricsToLogs is false or extensionLayer is set. Remember to add the secretsmanager:GetSecretValue permission to the Lambda execution role.
apiKeySecretapi_key_secretAn AWS CDK ISecret representing a secret storing the Datadog API key in AWS Secrets Manager. Use this parameter in place of apiKeySecretArn to automatically grant your Lambda execution roles read access to the given secret. See here for an example. Only available in datadog-cdk-constructs-v2.
apiKmsKeyapi_kms_keyDatadog API Key encrypted using KMS. Use this parameter in place of apiKey when flushMetricsToLogs is false or extensionLayerVersion or extensionLayerArn is set, and you are using KMS encryption.
enableDatadogTracingenable_datadog_tracingEnable Datadog tracing on your Lambda functions. Defaults to true.
enableMergeXrayTracesenable_merge_xray_tracesEnable merging X-Ray traces on your Lambda functions. Defaults to false.
enableDatadogLogsenable_datadog_logsSend Lambda function logs to Datadog via the Datadog Lambda Extension. Defaults to true. Note: This setting has no effect on logs sent via the Datadog Forwarder.
enableDatadogASMenable_datadog_asmEnable Datadog Application Security Management (ASM) on the Lambda function. Requires the Datadog extension to be present (using extensionLayerVersion or extensionLayerArn) and enableDatadogTracing. Defaults to false.
captureLambdaPayloadcapture_lambda_payloadCaptures incoming and outgoing AWS Lambda payloads in the Datadog APM spans for Lambda invocations. Defaults to false.
sourceCodeIntegrationsource_code_integrationEnable Datadog Source Code Integration, connecting your telemetry with application code in your Git repositories. This requires the Datadog Github integration to work, otherwise please follow the alternative method. Learn more here. Defaults to true.
injectLogContextinject_log_contextWhen set, the Lambda layer will automatically patch console.log with Datadog’s tracing ids. Defaults to true.
logLevellog_levelWhen set to debug, the Datadog Lambda Library and Extension will log additional information to help troubleshoot issues.
envenvWhen set along with extensionLayerVersion or extensionLayerArn, a DD_ENV environment variable is added to all Lambda functions with the provided value. When set along with forwarderArn, an env tag is added to all Lambda functions with the provided value.
serviceserviceWhen set along with extensionLayerVersion or extensionLayerArn, a DD_SERVICE environment variable is added to all Lambda functions with the provided value. When set along with forwarderArn, a service tag is added to all Lambda functions with the provided value.
versionversionWhen set along with extensionLayerVersion or extensionLayerArn, a DD_VERSION environment variable is added to all Lambda functions with the provided value. When set along with forwarderArn, a version tag is added to all Lambda functions with the provided value.
tagstagsA comma separated list of key:value pairs as a single string. When set along with extensionLayerVersion or extensionLayerArn, a DD_TAGS environment variable is added to all Lambda functions with the provided value. When set along with forwarderArn, the cdk parses the string and sets each key:value pair as a tag to all Lambda functions.
enableColdStartTracingenable_cold_start_tracingSet to false to disable Cold Start Tracing. Used in Node.js and Python. Defaults to true.
coldStartTraceMinDurationmin_cold_start_trace_durationSets the minimum duration (in milliseconds) for a module load event to be traced via Cold Start Tracing. Number. Defaults to 3.
coldStartTraceSkipLibscold_start_trace_skip_libsOptionally skip creating Cold Start Spans for a comma-separated list of libraries. Useful to limit depth or skip known libraries. Default depends on runtime.
enableProfilingenable_profilingEnable the Datadog Continuous Profiler with true. Supported in Beta for Node.js and Python. Defaults to false.
encodeAuthorizerContextencode_authorizer_contextWhen set to true for Lambda authorizers, the tracing context will be encoded into the response for propagation. Supported for Node.js and Python. Defaults to true.
decodeAuthorizerContextdecode_authorizer_contextWhen set to true for Lambdas that are authorized via Lambda authorizers, it will parse and use the encoded tracing context (if found). Supported for Node.js and Python. Defaults to true.
apmFlushDeadlineapm_flush_deadlineUsed to determine when to submit spans before a timeout occurs, in milliseconds. When the remaining time in an AWS Lambda invocation is less than the value set, the tracer attempts to submit the current active spans and all finished spans. Supported for Node.js and Python. Defaults to 100 milliseconds.
redirectHandlerredirect_handlerWhen set to false, skip redirecting handler to the Datadog Lambda Library’s handler. Useful when only instrumenting with Datadog Lambda Extension. Defaults to true.
grantSecretReadAccessgrant_secret_read_accessWhen set to true and apiKeySecretArn is provided, automatically grant read access to the given secret to all the lambdas added. Defaults to true.

Note: Using the parameters above may override corresponding function level DD_XXX environment variables.

Tracing

Enable X-Ray Tracing on your Lambda functions. For more information, see CDK documentation.

import * as lambda from "aws-cdk-lib/aws-lambda";

const lambda_function = new lambda.Function(this, "HelloHandler", {
  runtime: lambda.Runtime.NODEJS_18_X,
  code: lambda.Code.fromAsset("lambda"),
  handler: "hello.handler",
  tracing: lambda.Tracing.ACTIVE,
});

Nested Stacks

Add the Datadog CDK Construct to each stack you wish to instrument with Datadog. In the example below, we initialize the Datadog CDK Construct and call addLambdaFunctions() in both the RootStack and NestedStack.

import { DatadogLambda } from "datadog-cdk-constructs-v2";
import * as cdk from "aws-cdk-lib";
import { Construct } from "constructs";

class RootStack extends cdk.Stack {
  constructor(scope: cdk.App, id: string, props?: cdk.StackProps) {
    super(scope, id, props);
    new NestedStack(this, "NestedStack");

    const datadogLambda = new DatadogLambda(this, "DatadogLambda", {
      nodeLayerVersion: <LAYER_VERSION>,
      pythonLayerVersion: <LAYER_VERSION>,
      javaLayerVersion: <LAYER_VERSION>,
      dotnetLayerVersion: <LAYER-VERSION>,
      addLayers: <BOOLEAN>,
      forwarderArn: "<FORWARDER_ARN>",
      flushMetricsToLogs: <BOOLEAN>,
      site: "<SITE>",
      apiKey: "{Datadog_API_Key}",
      apiKeySecretArn: "{Secret_ARN_Datadog_API_Key}",
      apiKmsKey: "{Encrypted_Datadog_API_Key}",
      enableDatadogTracing: <BOOLEAN>,
      enableMergeXrayTraces: <BOOLEAN>,
      enableDatadogLogs: <BOOLEAN>,
      injectLogContext: <BOOLEAN>
    });
    datadogLambda.addLambdaFunctions([<LAMBDA_FUNCTIONS>]);

  }
}

class NestedStack extends cdk.NestedStack {
  constructor(scope: Construct, id: string, props?: cdk.NestedStackProps) {
    super(scope, id, props);

    const datadogLambda = new DatadogLambda(this, "DatadogLambda", {
      nodeLayerVersion: <LAYER_VERSION>,
      pythonLayerVersion: <LAYER_VERSION>,
      javaLayerVersion: <LAYER_VERSION>,
      dotnetLayerVersion: <LAYER-VERSION>,
      addLayers: <BOOLEAN>,
      forwarderArn: "<FORWARDER_ARN>",
      flushMetricsToLogs: <BOOLEAN>,
      site: "<SITE>",
      apiKey: "{Datadog_API_Key}",
      apiKeySecretArn: "{Secret_ARN_Datadog_API_Key}",
      apiKmsKey: "{Encrypted_Datadog_API_Key}",
      enableDatadogTracing: <BOOLEAN>,
      enableMergeXrayTraces: <BOOLEAN>,
      enableDatadogLogs: <BOOLEAN>,
      injectLogContext: <BOOLEAN>
    });
    datadogLambda.addLambdaFunctions([<LAMBDA_FUNCTIONS>]);

  }
}

Tags

Add tags to your constructs. We recommend setting an env and service tag to tie Datadog telemetry together. For more information see official AWS documentation and CDK documentation.

Automatically grant AWS secret read access to Lambda execution role

Only available in datadog-cdk-constructs-v2

To automatically grant your Lambda execution roles read access to a given secret, pass in apiKeySecret in place of apiKeySecretArn when initializing the DatadogLambda construct.

const { Secret } = require('aws-cdk-lib/aws-secretsmanager');

const secret = Secret.fromSecretPartialArn(this, 'DatadogApiKeySecret', 'arn:aws:secretsmanager:us-west-1:123:secret:DATADOG_API_KEY');

const datadogLambda = new DatadogLambda(this, 'DatadogLambda', {
  ...
  apiKeySecret: secret
  ...
});

When addLambdaFunctions is called, the Datadog CDK construct grants your Lambda execution roles read access to the given AWS secret. This is done through the AWS ISecret’s grantRead function.

How it works

The DatadogLambda construct takes in a list of lambda functions and installs the Datadog Lambda Library by attaching the Lambda Layers for .NET, Java, Node.js, and Python to your functions. It redirects to a replacement handler that initializes the Lambda Library without any required code changes. Additional configurations added to the Datadog CDK construct will also translate into their respective environment variables under each lambda function (if applicable / required).

While Lambda function based log groups are handled by the addLambdaFunctions method automatically, the construct has an additional function addForwarderToNonLambdaLogGroups which subscribes the forwarder to any additional log groups of your choosing.

Step Functions

Only AWS CDK v2 is supported.

Usage

TypeScript

Example stack: step-functions-typescript-stack

Basic setup
import * as sfn from "aws-cdk-lib/aws-stepfunctions";
import { DatadogStepFunctions} from "datadog-cdk-constructs-v2";

const stateMachine = new sfn.StateMachine(...);
const datadogSfn = new DatadogStepFunctions(this, "DatadogSfn", {
  env: "<ENV>", // e.g. "dev"
  service: "<SERVICE>", // e.g. "my-cdk-service"
  version: "<VERSION>", // e.g. "1.0.0"
  forwarderArn: "<FORWARDER_ARN>", // e.g. "arn:test:forwarder:sa-east-1:12345678:1"
  tags: <TAGS>, // optional, e.g. "custom-tag-1:tag-value-1,custom-tag-2:tag-value-2"
});
datadogSfn.addStateMachines([stateMachine]);
Merging traces

To merge the Step Function’s traces with downstream Lambda function or Step function’s traces, modify the Lambda task payload or Step Function task input:

import * as tasks from "aws-cdk-lib/aws-stepfunctions-tasks";
import * as sfn from "aws-cdk-lib/aws-stepfunctions";
import { DatadogStepFunctions, DatadogLambda } from "datadog-cdk-constructs-v2";

const lambdaFunction = ...;
const lambdaTask = new tasks.LambdaInvoke(this, "MyLambdaTask", {
  lambdaFunction: lambdaFunction,
  payload: sfn.TaskInput.fromObject(
    DatadogStepFunctions.buildLambdaPayloadToMergeTraces(
      { "custom-key": "custom-value" }
    )
  ),
});

const childStateMachine = new sfn.StateMachine(...);
const invokeChildStateMachineTask = new tasks.StepFunctionsStartExecution(this, "InvokeChildStateMachineTask", {
  stateMachine: childStateMachine,
  input: sfn.TaskInput.fromObject(
    DatadogStepFunctions.buildStepFunctionTaskInputToMergeTraces({ "custom-key": "custom-value" }),
  ),
});

const stateMachine = new sfn.StateMachine(this, "CdkTypeScriptTestStateMachine", {
  definitionBody: sfn.DefinitionBody.fromChainable(lambdaTask.next(invokeChildStateMachineTask)),
});

const datadogLambda = ...;
datadogLambda.addLambdaFunctions([lambdaFunction]);

const datadogSfn = ...;
datadogSfn.addStateMachines([childStateMachine, stateMachine]);

Python

Example stack: step-functions-python-stack

Basic setup
from aws_cdk import (
    aws_stepfunctions as sfn,
    aws_stepfunctions_tasks as tasks,
)
from datadog_cdk_constructs_v2 import DatadogStepFunctions, DatadogLambda

state_machine = sfn.StateMachine(...)
datadog_sfn = DatadogStepFunctions(
    self,
    "DatadogSfn",
    env="<ENV>", # e.g. "dev"
    service="<SERVICE>", # e.g. "my-cdk-service"
    version="<VERSION>", # e.g. "1.0.0"
    forwarderArn="<FORWARDER_ARN>", # e.g. "arn:test:forwarder:sa-east-1:12345678:1"
    tags=<TAGS>, # optional, e.g. "custom-tag-1:tag-value-1,custom-tag-2:tag-value-2"
)
datadog_sfn.add_state_machines([child_state_machine, parent_state_machine])
Merging traces

To merge the Step Function’s traces with downstream Lambda function or Step function’s traces, modify the Lambda task payload or Step Function task input:

from aws_cdk import (
    aws_lambda,
    aws_stepfunctions as sfn,
    aws_stepfunctions_tasks as tasks,
)
from datadog_cdk_constructs_v2 import DatadogStepFunctions, DatadogLambda

lambda_function = aws_lambda.Function(...)
lambda_task = tasks.LambdaInvoke(
    self,
    "MyLambdaTask",
    lambda_function=lambda_function,
    payload=sfn.TaskInput.from_object(
        DatadogStepFunctions.build_lambda_payload_to_merge_traces(
            {"custom-key": "custom-value"}
        )
    ),
)

child_state_machine = sfn.StateMachine(...)
invoke_child_state_machine_task = tasks.StepFunctionsStartExecution(
    self,
    "InvokeChildStateMachineTask",
    state_machine=child_state_machine,
    input=sfn.TaskInput.from_object(
        DatadogStepFunctions.build_step_function_task_input_to_merge_traces(
            {"custom-key": "custom-value"}
        )
    ),
)

state_machine = sfn.StateMachine(
    self,
    "CdkPythonTestStateMachine",
    definition_body=sfn.DefinitionBody.from_chainable(
        lambda_task.next(invoke_child_state_machine_task)
    ),
)

datadog_lambda = DatadogLambda(...)
datadog_lambda.add_lambda_functions([lambda_function])

datadog_sfn = DatadogStepFunctions(...)
datadog_sfn.add_state_machines([child_state_machine, state_machine])

Go

Example stack: step-functions-go-stack

Basic setup
import (
	"github.com/DataDog/datadog-cdk-constructs-go/ddcdkconstruct/v2"
	"github.com/aws/aws-cdk-go/awscdk/v2"
	sfn "github.com/aws/aws-cdk-go/awscdk/v2/awsstepfunctions"
)

stack := awscdk.NewStack(...)
stateMachine := sfn.NewStateMachine(...)
datadogSfn := ddcdkconstruct.NewDatadogStepFunctions(
  stack,
  jsii.String("DatadogSfn"),
  &ddcdkconstruct.DatadogStepFunctionsProps{
    Env:            jsii.String("<ENV>"), // e.g. "dev"
    Service:        jsii.String("<SERVICE>), // e.g. "my-cdk-service"
    Version:        jsii.String("<VERSION>"), // e.g. "1.0.0"
    ForwarderArn:   jsii.String("<FORWARDER_ARN>"), // e.g. "arn:test:forwarder:sa-east-1:12345678:1"
    Tags:           jsii.String("<TAGS>"), // optional, e.g. "custom-tag-1:tag-value-1,custom-tag-2:tag-value-2"
  }
)
datadogSfn.AddStateMachines(&[]sfn.StateMachine{stateMachine}, nil)
Merging traces

To merge the Step Function’s traces with downstream Lambda function or Step function’s traces, modify the Lambda task payload or Step Function task input:

import (
	"github.com/DataDog/datadog-cdk-constructs-go/ddcdkconstruct/v2"
	"github.com/aws/aws-cdk-go/awscdk/v2/awslambda"
	sfn "github.com/aws/aws-cdk-go/awscdk/v2/awsstepfunctions"
	sfntasks "github.com/aws/aws-cdk-go/awscdk/v2/awsstepfunctionstasks"
	"github.com/aws/jsii-runtime-go"
)

lambdaFunction := awslambda.NewFunction(...)
lambdaPayload := ddcdkconstruct.DatadogStepFunctions_BuildLambdaPayloadToMergeTraces(&map[string]interface{}{
  "custom-key": "custom-value",
})
lambdaTask := sfntasks.NewLambdaInvoke(stack, jsii.String("MyLambdaTask"), &sfntasks.LambdaInvokeProps{
  LambdaFunction: lambdaFunction,
  Payload: sfn.TaskInput_FromObject(lambdaPayload),
})

childStateMachine := sfn.NewStateMachine(...)
stateMachineTaskInput := ddcdkconstruct.DatadogStepFunctions_BuildStepFunctionTaskInputToMergeTraces(
  &map[string]interface{}{
    "custom-key": "custom-value",
  }
)
invokeChildStateMachineTask := sfntasks.NewStepFunctionsStartExecution(
  stack,
  jsii.String("InvokeChildStateMachineTask"),
  &sfntasks.StepFunctionsStartExecutionProps{
    StateMachine: childStateMachine,
    Input: sfn.TaskInput_FromObject(stateMachineTaskInput),
  }
)
stateMachine := sfn.NewStateMachine(stack, jsii.String("CdkGoTestStateMachine"), &sfn.StateMachineProps{
  DefinitionBody: sfn.DefinitionBody_FromChainable(lambdaTask.Next(invokeChildStateMachineTask)),
})

datadogLambda := ...
datadogLambda.AddLambdaFunctions(&[]interface{}{lambdaFunction}, nil)

datadogSfn := ...
datadogSfn.AddStateMachines(&[]sfn.StateMachine{childStateMachine, stateMachine}, nil)

Configuration

Parameters for creating the DatadogStepFunctions construct:

npm package parameterPyPI package parameterGo package parameterDescription
envenvEnvThe env tag to be added to the state machine.
serviceserviceServiceThe service tag to be added to the state machine.
versionversionVersionThe version tag to be added to the state machine.
forwarderArnforwarder_arnForwarderArnARN or Datadog Forwarder, which will subscribe to the state machine’s log group.
tagstagsTagsA comma separated list of key:value pairs as a single string, which will be added to the state machine’s tags.

How it works

The DatadogStepFunctions construct takes in a list of state machines and for each of them:

  1. Set up logging, including:
    1. Set log level to ALL
    2. Set includeExecutionData to true
    3. Create and set destination log group (if not set already)
    4. Add permissions to the state machine role to log to CloudWatch Logs
  2. Subscribe Datadog Forwarder to the state machine’s log group
  3. Set tags, including:
    1. env
    2. service
    3. version
    4. DD_TRACE_ENABLED: true. This enables tracing.
      1. To disable tracing, set it to false from AWS Management Console after the stack is deployed.
      2. If you wish to disable tracing using CDK, please open an issue so we can support it.
    5. dd_cdk_construct version tag
    6. custom tags passed as the tags paramater to DatadogStepFunctions construct

To merge the Step Function’s traces with downstream Lambda function or Step function’s traces, the construct adds $$.Execution, $$.State and $$.StateMachine fields into the Step Function task input or Lambda task payload.

Troubleshooting

Log group already exists

If cdk deploy fails with an error like:

Resource of type ‘AWS::Logs::LogGroup’ with identifier ‘{"/properties/LogGroupName":"/aws/vendedlogs/states/CdkStepFunctionsTypeScriptStack1-CdkTypeScriptTestChildStateMachine-Logs-dev"}’ already exists.

You have two options:

  1. Delete the log group if you no longer need the logs in it. You may do so from AWS Management Console, at CloudWatch -> Logs -> Log groups.
  2. Update the state machine definition if you wish to use the existing log group:
import * as logs from 'aws-cdk-lib/aws-logs';

const logGroupName = "/aws/vendedlogs/states/xxx";
const logGroup = logs.LogGroup.fromLogGroupName(stack, 'StateMachineLogGroup', logGroupName);

const stateMachine = new sfn.StateMachine(stack, 'MyStateMachine', {
  logs: {
    destination: logGroup,
  },
  ...
});

Resources to learn about CDK

Using Projen

The Datadog CDK Construct Libraries use Projen to maintain project configuration files such as the package.json, .gitignore, .npmignore, etc. Most of the configuration files will be protected by Projen via read-only permissions. In order to change these files, edit the .projenrc.js file, then run npx projen to synthesize the new changes. Check out Projen for more details.

Migrating from v2-1.x.x to v2-2.x.x

In February 2025, Datadog released a major version update from 1.x.x to 2.x.x. The required changes to migrate to the new version are as follows:

  1. Rename the classes for instrumenting Lambda functions:

    1. Datadog -> DatadogLambda
    2. DatadogProps -> DatadogLambdaProps For examples, see the Usage section of this page and examples/ folder of the GitHub repository.
  2. Upgrade Node.js version to 18.18.0 or above.

  3. For Go, change the import from:

    "github.com/DataDog/datadog-cdk-constructs-go/ddcdkconstruct"
    

    to:

    "github.com/DataDog/datadog-cdk-constructs-go/ddcdkconstruct/v2"
    

Opening Issues

If you encounter a bug with this package, we want to hear about it. Before opening a new issue, search the existing issues to avoid duplicates.

When opening an issue, include the Datadog CDK Construct version, Node version, and stack trace if available. In addition, include the steps to reproduce when appropriate.

You can also open an issue for a feature request.

Contributing

If you find an issue with this package and have a fix, please feel free to open a pull request following the procedures.

Testing

If you contribute to this package you can run the tests using yarn test. This package also includes a sample application for manual testing:

  1. Open a seperate terminal.
  2. Run yarn watch, this will ensure the Typescript files in the src directory are compiled to Javascript in the lib directory.
  3. Navigate to src/sample, here you can edit index.ts to test your contributions manually.
  4. At the root directory, run npx cdk --app lib/sample/index.js <CDK Command>, replacing <CDK Command> with common CDK commands like synth, diff, or deploy.
  • Note, if you receive “… is not authorized to perform: …” you may also need to authorize the commands with your AWS credentials.

Debug Logs

To display the debug logs for this library for Lambda, set the DD_CONSTRUCT_DEBUG_LOGS env var to true when running cdk synth (use --quiet to suppress generated template output).

Example: Ensure you are at the root directory

DD_CONSTRUCT_DEBUG_LOGS=true npx cdk --app lib/sample/index.js synth --quiet

Community

For product feedback and questions, join the #serverless channel in the Datadog community on Slack.

License

Unless explicitly stated otherwise all files in this repository are licensed under the Apache License Version 2.0.

This product includes software developed at Datadog (https://www.datadoghq.com/). Copyright 2021 Datadog, Inc.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers