Microsoft Azure SQL Elastic Pool

Información general

Los pools elásticos proporcionan una solución simple y rentable para gestionar el rendimiento de múltiples bases de datos.

Obtén métricas de Azure SQL Elastic Pool para:

  • Visualizar el rendimiento de tus SQL Elastic Pools.
  • Correlacionar el rendimiento de tus SQL Elastic Pools con tus aplicaciones.

Configuración

Instalación

Si aún no lo has hecho, configura la integración Microsoft Azure. No es necesario realizar ningún otro paso de instalación.

Datos recopilados

Métricas

azure.sql_servers_elasticpools.cpu_percent
(gauge)
Average compute utilization in percentage of the limit of the pool
Shown as percent
azure.sql_servers_elasticpools.data_space_allocated
(gauge)
Data space allocated
Shown as byte
azure.sql_servers_elasticpools.data_space_allocated_percent
(gauge)
Data space allocated percent
Shown as percent
azure.sql_servers_elasticpools.dtu_consumption_percent
(gauge)
Average eDTU utilization in percentage of eDTU limit for the pool
Shown as percent
azure.sql_servers_elasticpools.e_dtu_limit
(gauge)
Current max elastic pool DTU setting for this elastic pool
Shown as unit
azure.sql_servers_elasticpools.e_dtu_used
(gauge)
Average eDTUs used by the pool
Shown as unit
azure.sql_servers_elasticpools.in_memory_oltp_storage_percent
(gauge)
In-Memory OLTP storage percent
Shown as percent
azure.sql_servers_elasticpools.log_write_percent
(gauge)
Average write resource utilization in percentage of the limit of the pool
Shown as percent
azure.sql_servers_elasticpools.physical_data_read_percent
(gauge)
Average I/O utilization in percentage based on the limit of the pool
Shown as percent
azure.sql_servers_elasticpools.sessions_percent
(gauge)
Maximum concurrent sessions in percentage based on the limit of the pool
Shown as percent
azure.sql_servers_elasticpools.sql_instance_cpu_percent
(gauge)
Maximum compute usage by all user and system workloads. Applies to elastic pools.
Shown as percent
azure.sql_servers_elasticpools.storage_limit
(gauge)
Current max elastic pool storage limit setting for this elastic pool in megabytes during this interval
Shown as byte
azure.sql_servers_elasticpools.storage_percent
(gauge)
Current max elastic pool storage limit setting for this elastic pool
Shown as percent
azure.sql_servers_elasticpools.storage_used
(gauge)
Average storage used by the pool in this interval in bytes
Shown as byte
azure.sql_servers_elasticpools.workers_percent
(gauge)
Maximum concurrent workers (requests) in percentage based on the limit of the pool
Shown as percent

Eventos

La integración Azure SQL Elastic Pools no incluye eventos.

Checks de servicios

La integración Azure SQL Elastic Pools no incluye checks de servicios.

Resolución de problemas

¿Necesitas ayuda? Ponte en contacto con el servicio de asistencia de Datadog.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers