Microsoft Azure SQL Elastic Pool

Présentation

Les pools élastiques constituent une solution simple et économique pour gérer les performances de plusieurs bases de données.

Recueillez des métriques d’Azure SQL Elastic Pool pour :

  • Visualiser les performances de vos pools élastiques SQL
  • Corréler les performances de vos pools élastiques SQL avec vos applications

Formule et utilisation

Liste des infrastructures

Si vous ne l’avez pas déjà fait, configurez d’abord l’intégration Microsoft Azure. Aucune autre procédure d’installation n’est requise.

Real User Monitoring

Analyse d’entonnoirs

azure.sql_servers_elasticpools.cpu_percent
(gauge)
Average compute utilization in percentage of the limit of the pool
Shown as percent
azure.sql_servers_elasticpools.data_space_allocated
(gauge)
Data space allocated
Shown as byte
azure.sql_servers_elasticpools.data_space_allocated_percent
(gauge)
Data space allocated percent
Shown as percent
azure.sql_servers_elasticpools.dtu_consumption_percent
(gauge)
Average eDTU utilization in percentage of eDTU limit for the pool
Shown as percent
azure.sql_servers_elasticpools.e_dtu_limit
(gauge)
Current max elastic pool DTU setting for this elastic pool
Shown as unit
azure.sql_servers_elasticpools.e_dtu_used
(gauge)
Average eDTUs used by the pool
Shown as unit
azure.sql_servers_elasticpools.in_memory_oltp_storage_percent
(gauge)
In-Memory OLTP storage percent
Shown as percent
azure.sql_servers_elasticpools.log_write_percent
(gauge)
Average write resource utilization in percentage of the limit of the pool
Shown as percent
azure.sql_servers_elasticpools.physical_data_read_percent
(gauge)
Average I/O utilization in percentage based on the limit of the pool
Shown as percent
azure.sql_servers_elasticpools.sessions_percent
(gauge)
Maximum concurrent sessions in percentage based on the limit of the pool
Shown as percent
azure.sql_servers_elasticpools.sql_instance_cpu_percent
(gauge)
Maximum compute usage by all user and system workloads. Applies to elastic pools.
Shown as percent
azure.sql_servers_elasticpools.storage_limit
(gauge)
Current max elastic pool storage limit setting for this elastic pool in megabytes during this interval
Shown as byte
azure.sql_servers_elasticpools.storage_percent
(gauge)
Current max elastic pool storage limit setting for this elastic pool
Shown as percent
azure.sql_servers_elasticpools.storage_used
(gauge)
Average storage used by the pool in this interval in bytes
Shown as byte
azure.sql_servers_elasticpools.workers_percent
(gauge)
Maximum concurrent workers (requests) in percentage based on the limit of the pool
Shown as percent

Aide

L’intégration Azure SQL Elastic Pool n’inclut aucun événement.

Aide

L’intégration Azure SQL Elastic Pool n’inclut aucun check de service.

Aide

Besoin d’aide ? Contactez l’assistance Datadog.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers