Información general

La integración .NET te permite recopilar y monitorizar logs, trazas (traces) y métricas personalizadas de tu aplicación .NET.

Configuración

Recopilación de métricas

Consulta la documentación específica para recopilar métricas de .NET personalizadas con DogStatsD.

Recopilación de trazas

Consulta la documentación específica para instrumentar tu aplicación .NET para enviar sus trazas a Datadog.

APM

Disponible para la versión 6.0 o posteriores del Agent

Consulta la documentación específica para configurar la recopilación de logs de .NET para reenviar tus logs a Datadog.

Recopilación de perfiles

Consulta la documentación específica para activar el generador de perfiles de .NET.

Datos recopilados

Métricas

runtime.dotnet.cpu.system
(gauge)
The number of milliseconds executing in the kernel
Shown as millisecond
runtime.dotnet.cpu.user
(gauge)
The number of milliseconds executing outside the kernel
Shown as millisecond
runtime.dotnet.cpu.percent
(gauge)
The percentage of total CPU used by the application
Shown as percent
runtime.dotnet.mem.committed
(gauge)
Memory usage
Shown as byte
runtime.dotnet.threads.count
(gauge)
The number of threads
Shown as thread
runtime.dotnet.threads.workers_count
(gauge)
The number of workers in the threadpool (.NET Core 3.1+ only)
Shown as thread
runtime.dotnet.threads.contention_time
(gauge)
The cumulated time spent by threads waiting on a lock (.NET Core 3.1+ only)
Shown as millisecond
runtime.dotnet.threads.contention_count
(count)
The number of times a thread stopped to wait on a lock
runtime.dotnet.exceptions.count
(count)
The number of first-chance exceptions
Shown as exception
runtime.dotnet.gc.size.gen0
(gauge)
The size of the gen 0 heap
Shown as byte
runtime.dotnet.gc.size.gen1
(gauge)
The size of the gen 1 heap
Shown as byte
runtime.dotnet.gc.size.gen2
(gauge)
The size of the gen 2 heap
Shown as byte
runtime.dotnet.gc.size.loh
(gauge)
The size of the large object heap
Shown as byte
runtime.dotnet.gc.memory_load
(gauge)
The percentage of the total memory used by the process. The GC changes its behavior when this value gets above 85. (.NET Core 3.1+ only)
Shown as percent
runtime.dotnet.gc.pause_time
(gauge)
The amount of time the GC paused the application threads (.NET Core 3.1+ only)
Shown as millisecond
runtime.dotnet.gc.count.gen0
(count)
The number of gen 0 garbage collections
Shown as garbage collection
runtime.dotnet.gc.count.gen1
(count)
The number of gen 1 garbage collections
Shown as garbage collection
runtime.dotnet.gc.count.gen2
(count)
The number of gen 2 garbage collections
Shown as garbage collection
runtime.dotnet.aspnetcore.requests.total
(gauge)
The total number of HTTP requests received by the server (.NET Core 3.1+ only)
Shown as request
runtime.dotnet.aspnetcore.requests.failed
(gauge)
The number of failed HTTP requests received by the server (.NET Core 3.1+ only)
Shown as request
runtime.dotnet.aspnetcore.requests.current
(gauge)
The total number of HTTP requests that have started but not yet stopped (.NET Core 3.1+ only)
Shown as request
runtime.dotnet.aspnetcore.requests.queue_length
(gauge)
The current length of the server HTTP request queue (.NET 5+ only)
Shown as request
runtime.dotnet.aspnetcore.connections.total
(gauge)
The total number of HTTP connections established to the server (.NET 5+ only)
Shown as connection
runtime.dotnet.aspnetcore.connections.current
(gauge)
The current number of active HTTP connections to the server (.NET 5+ only)
Shown as connection
runtime.dotnet.aspnetcore.connections.queue_length
(gauge)
The current length of the HTTP server connection queue (.NET 5+ only)
Shown as connection

Eventos

La integración .NET no incluye eventos.

Checks de servicio

La integración .NET no incluye checks de servicio.

Resolución de problemas

¿Necesitas ayuda? Ponte en contacto con el servicio de asistencia de Datadog.

Leer más

Más enlaces, artículos y documentación útiles:

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers