.NET

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Overview

The .NET integration allows you to collect and monitor your .NET application logs, traces, and custom metrics.

Setup

Metric collection

See the dedicated documentation for collecting .NET custom metrics with DogStatsD.

Trace collection

See the dedicated documentation for instrumenting your .NET application to send its traces to Datadog.

Log collection

Available for Agent v6.0+

See the dedicated documentation on how to setup .NET log collection to forward your logs to Datadog.

Profile collection

See the dedicated documentation for enabling the .NET profiler.

Data Collected

Metrics

runtime.dotnet.cpu.system
(gauge)
The number of milliseconds executing in the kernel
Shown as millisecond
runtime.dotnet.cpu.user
(gauge)
The number of milliseconds executing outside the kernel
Shown as millisecond
runtime.dotnet.cpu.percent
(gauge)
The percentage of total CPU used by the application
Shown as percent
runtime.dotnet.mem.committed
(gauge)
Memory usage
Shown as byte
runtime.dotnet.threads.count
(gauge)
The number of threads
Shown as thread
runtime.dotnet.threads.workers_count
(gauge)
The number of workers in the threadpool (.NET Core 3.1+ only)
Shown as thread
runtime.dotnet.threads.contention_time
(gauge)
The cumulated time spent by threads waiting on a lock (.NET Core 3.1+ only)
Shown as millisecond
runtime.dotnet.threads.contention_count
(count)
The number of times a thread stopped to wait on a lock
runtime.dotnet.exceptions.count
(count)
The number of first-chance exceptions
Shown as exception
runtime.dotnet.gc.size.gen0
(gauge)
The size of the gen 0 heap
Shown as byte
runtime.dotnet.gc.size.gen1
(gauge)
The size of the gen 1 heap
Shown as byte
runtime.dotnet.gc.size.gen2
(gauge)
The size of the gen 2 heap
Shown as byte
runtime.dotnet.gc.size.loh
(gauge)
The size of the large object heap
Shown as byte
runtime.dotnet.gc.memory_load
(gauge)
The percentage of the total memory used by the process. The GC changes its behavior when this value gets above 85. (.NET Core 3.1+ only)
Shown as percent
runtime.dotnet.gc.pause_time
(gauge)
The amount of time the GC paused the application threads (.NET Core 3.1+ only)
Shown as millisecond
runtime.dotnet.gc.count.gen0
(count)
The number of gen 0 garbage collections
Shown as garbage collection
runtime.dotnet.gc.count.gen1
(count)
The number of gen 1 garbage collections
Shown as garbage collection
runtime.dotnet.gc.count.gen2
(count)
The number of gen 2 garbage collections
Shown as garbage collection
runtime.dotnet.aspnetcore.requests.total
(gauge)
The total number of HTTP requests received by the server (.NET Core 3.1+ only)
Shown as request
runtime.dotnet.aspnetcore.requests.failed
(gauge)
The number of failed HTTP requests received by the server (.NET Core 3.1+ only)
Shown as request
runtime.dotnet.aspnetcore.requests.current
(gauge)
The total number of HTTP requests that have started but not yet stopped (.NET Core 3.1+ only)
Shown as request
runtime.dotnet.aspnetcore.requests.queue_length
(gauge)
The current length of the server HTTP request queue (.NET 5+ only)
Shown as request
runtime.dotnet.aspnetcore.connections.total
(gauge)
The total number of HTTP connections established to the server (.NET 5+ only)
Shown as connection
runtime.dotnet.aspnetcore.connections.current
(gauge)
The current number of active HTTP connections to the server (.NET 5+ only)
Shown as connection
runtime.dotnet.aspnetcore.connections.queue_length
(gauge)
The current length of the HTTP server connection queue (.NET 5+ only)
Shown as connection

Events

The .NET integration does not include any events.

Service Checks

The .NET integration does not include any service checks.

Troubleshooting

Need help? Contact Datadog support.

Further Reading

추가 유용한 문서, 링크 및 기사:

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers