.NET

Présentation

L’intégration .NET vous permet de recueillir et de surveiller les logs, les traces et les métriques custom de vos applications .NET.

Configuration

Collecte de métriques

Consultez la documentation relative à la collecte de métriques custom .NET avec DogStatsD.

Collecte de traces

Consultez la documentation relative à l’instrumentation de votre application .NET pour envoyer ses traces à Datadog.

Collecte de logs

Disponible à partir des versions > 6.0 de l’Agent

Consultez la documentation relative à la configuration de la collecte de logs .NET pour transmettre vos logs à Datadog.

Données collectées

Métriques

runtime.dotnet.cpu.system
(gauge)
The number of milliseconds executing in the kernel
Shown as millisecond
runtime.dotnet.cpu.user
(gauge)
The number of milliseconds executing outside the kernel
Shown as millisecond
runtime.dotnet.cpu.percent
(gauge)
The percentage of total CPU used by the application
Shown as percent
runtime.dotnet.mem.committed
(gauge)
Memory usage
Shown as byte
runtime.dotnet.threads.count
(gauge)
The number of threads
Shown as thread
runtime.dotnet.threads.workers_count
(gauge)
The number of workers in the threadpool (.NET Core 3.1+ only)
Shown as thread
runtime.dotnet.threads.contention_time
(gauge)
The cumulated time spent by threads waiting on a lock (.NET Core 3.1+ only)
Shown as millisecond
runtime.dotnet.threads.contention_count
(count)
The number of times a thread stopped to wait on a lock
runtime.dotnet.exceptions.count
(count)
The number of first-chance exceptions
Shown as exception
runtime.dotnet.gc.size.gen0
(gauge)
The size of the gen 0 heap
Shown as byte
runtime.dotnet.gc.size.gen1
(gauge)
The size of the gen 1 heap
Shown as byte
runtime.dotnet.gc.size.gen2
(gauge)
The size of the gen 2 heap
Shown as byte
runtime.dotnet.gc.size.loh
(gauge)
The size of the large object heap
Shown as byte
runtime.dotnet.gc.memory_load
(gauge)
The percentage of the total memory used by the process. The GC changes its behavior when this value gets above 85. (.NET Core 3.1+ only)
Shown as percent
runtime.dotnet.gc.pause_time
(gauge)
The amount of time the GC paused the application threads (.NET Core 3.1+ only)
Shown as millisecond
runtime.dotnet.gc.count.gen0
(count)
The number of gen 0 garbage collections
Shown as garbage collection
runtime.dotnet.gc.count.gen1
(count)
The number of gen 1 garbage collections
Shown as garbage collection
runtime.dotnet.gc.count.gen2
(count)
The number of gen 2 garbage collections
Shown as garbage collection
runtime.dotnet.aspnetcore.requests.total
(gauge)
The total number of HTTP requests received by the server (.NET Core 3.1+ only)
Shown as request
runtime.dotnet.aspnetcore.requests.failed
(gauge)
The number of failed HTTP requests received by the server (.NET Core 3.1+ only)
Shown as request
runtime.dotnet.aspnetcore.requests.current
(gauge)
The total number of HTTP requests that have started but not yet stopped (.NET Core 3.1+ only)
Shown as request
runtime.dotnet.aspnetcore.requests.queue_length
(gauge)
The current length of the server HTTP request queue (.NET 5+ only)
Shown as request
runtime.dotnet.aspnetcore.connections.total
(gauge)
The total number of HTTP connections established to the server (.NET 5+ only)
Shown as connection
runtime.dotnet.aspnetcore.connections.current
(gauge)
The current number of active HTTP connections to the server (.NET 5+ only)
Shown as connection
runtime.dotnet.aspnetcore.connections.queue_length
(gauge)
The current length of the HTTP server connection queue (.NET 5+ only)
Shown as connection

Événements

L’intégration .NET n’inclut aucun événement.

Checks de service

L’intégration .NET n’inclut aucun check de service.

Dépannage

Besoin d’aide ? Contactez l’assistance Datadog.

Pour aller plus loin

Documentation, liens et articles supplémentaires utiles:

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers