Server parameter 'log_checkpoints' should be enabled for PostgreSQL Database Server

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

Enable log_checkpoints on PostgreSQL Servers. Enabling log_checkpoints helps the PostgreSQL Database to log each checkpoint and generate query and error logs. Access to transaction logs is not supported. Query and error logs can be used to identify, troubleshoot, and repair configuration errors and sub-optimal performance.

Remediation

From the console

  1. Log in to Azure Portal.
  2. Go to Azure Database for PostgreSQL server.
  3. For each database, click Server parameters.
  4. Search for log_checkpoints.
  5. Click ON and save
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers