Server parameter 'log_checkpoints' should be enabled for PostgreSQL Database Server

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Description

Enable log_checkpoints on PostgreSQL Servers. Enabling log_checkpoints helps the PostgreSQL Database to log each checkpoint and generate query and error logs. Access to transaction logs is not supported. Query and error logs can be used to identify, troubleshoot, and repair configuration errors and sub-optimal performance.

Remediation

From the console

  1. Log in to Azure Portal.
  2. Go to Azure Database for PostgreSQL server.
  3. For each database, click Server parameters.
  4. Search for log_checkpoints.
  5. Click ON and save
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers