Checkpoint Quantum firewall ransomware infection detected

This rule is part of a beta feature. To learn more, contact Support.
Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Goal

Detect when Checkpoint’s Anti-Ransomware solution raises a ransomware infection alert.

Strategy

This rule monitors Checkpoint Quantum Firewall logs for when a ransomware infection is detected by the Anti-Ransomware product. This rule uses the third-party detection method to create a signal with the same serverity as the event severity (@checkpoint_firewall_severity).

Triage and response

  1. Investigate the Checkpoint alert to determine if it is malicious or benign.
  2. If the alert is benign, consider including the user or host in a suppression list. See Best practices for creating detection rules with Datadog Cloud SIEM for more information.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers