Checkpoint Quantum firewall ransomware infection detected

This rule is part of a beta feature. To learn more, contact Support.
이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Goal

Detect when Checkpoint’s Anti-Ransomware solution raises a ransomware infection alert.

Strategy

This rule monitors Checkpoint Quantum Firewall logs for when a ransomware infection is detected by the Anti-Ransomware product. This rule uses the third-party detection method to create a signal with the same serverity as the event severity (@checkpoint_firewall_severity).

Triage and response

  1. Investigate the Checkpoint alert to determine if it is malicious or benign.
  2. If the alert is benign, consider including the user or host in a suppression list. See Best practices for creating detection rules with Datadog Cloud SIEM for more information.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers