Azure SQL Elastic Pool

Overview

Elastic pools provide a simple and cost effective solution for managing the performance of multiple databases.

Get metrics from Azure SQL Elastic Pool to:

  • Visualize the performance of your SQL Elastic Pools.
  • Correlate the performance of your SQL Elastic Pools with your applications.

Setup

Installation

If you haven’t already, set up the Microsoft Azure integration. No additional installation steps are required.

Data Collected

Metrics

azure.sql_servers_elasticpools.cpu_percent
(gauge)
Average compute utilization in percentage of the limit of the pool
Shown as percent
azure.sql_servers_elasticpools.data_space_allocated
(gauge)
Data space allocated
Shown as byte
azure.sql_servers_elasticpools.data_space_allocated_percent
(gauge)
Data space allocated percent
Shown as percent
azure.sql_servers_elasticpools.dtu_consumption_percent
(gauge)
Average eDTU utilization in percentage of eDTU limit for the pool
Shown as percent
azure.sql_servers_elasticpools.e_dtu_limit
(gauge)
Current max elastic pool DTU setting for this elastic pool
Shown as unit
azure.sql_servers_elasticpools.e_dtu_used
(gauge)
Average eDTUs used by the pool
Shown as unit
azure.sql_servers_elasticpools.in_memory_oltp_storage_percent
(gauge)
In-Memory OLTP storage percent
Shown as percent
azure.sql_servers_elasticpools.log_write_percent
(gauge)
Average write resource utilization in percentage of the limit of the pool
Shown as percent
azure.sql_servers_elasticpools.physical_data_read_percent
(gauge)
Average I/O utilization in percentage based on the limit of the pool
Shown as percent
azure.sql_servers_elasticpools.sessions_percent
(gauge)
Maximum concurrent sessions in percentage based on the limit of the pool
Shown as percent
azure.sql_servers_elasticpools.sql_instance_cpu_percent
(gauge)
Maximum compute usage by all user and system workloads. Applies to elastic pools.
Shown as percent
azure.sql_servers_elasticpools.storage_limit
(gauge)
Current max elastic pool storage limit setting for this elastic pool in megabytes during this interval
Shown as byte
azure.sql_servers_elasticpools.storage_percent
(gauge)
Current max elastic pool storage limit setting for this elastic pool
Shown as percent
azure.sql_servers_elasticpools.storage_used
(gauge)
Average storage used by the pool in this interval in bytes
Shown as byte
azure.sql_servers_elasticpools.workers_percent
(gauge)
Maximum concurrent workers (requests) in percentage based on the limit of the pool
Shown as percent

Events

The Azure SQL Elastic pools integration does not include any events.

Service Checks

The Azure SQL Elastic pools integration does not include any service checks.

Troubleshooting

Need help? Contact Datadog support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers