Workload Protection Supported Linux Distributions

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Workload Protection supports the following Linux distributions:

Linux DistributionsSupported Versions
Ubuntu LTS18.04, 20.04, 22.04
Debian10 or later
Amazon Linux 2Kernels 4.14 and higher
Amazon Linux 2023All versions
SUSE Linux Enterprise Server12 and 15
Red Hat Enterprise Linux7, 8, and 9
Oracle Linux7, 8, and 9
CentOS7
Google Container Optimized OS (default on GKE) (Preview)93 and higher

Notes:

  • Custom kernel builds are not supported.
  • The Workload Protection eBPF-less solution for eBPF disabled environments uses a ptrace-based Datadog Agent. The ptrace-based Datadog Agent supports Linux kernel versions from 3.4.43 to 4.9.85.
  • For compatibility with a custom Kubernetes network plugin like Cilium or Calico, see Troubleshooting Workload Protection.
  • Data collection is done using eBPF, so Datadog requires, at minimum, platforms that have underlying Linux kernel versions of 4.14.0+ or have eBPF features backported (for example, Centos/RHEL 7 with kernel 3.10 has eBPF features backported, so it is supported).
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers