Workload Protection Supported Linux Distributions

이 페이지는 아직 영어로 제공되지 않습니다. 번역 작업 중입니다.
현재 번역 프로젝트에 대한 질문이나 피드백이 있으신 경우 언제든지 연락주시기 바랍니다.

Workload Protection supports the following Linux distributions:

Linux DistributionsSupported Versions
Ubuntu LTS18.04, 20.04, 22.04
Debian10 or later
Amazon Linux 2Kernels 4.14 and higher
Amazon Linux 2023All versions
SUSE Linux Enterprise Server12 and 15
Red Hat Enterprise Linux7, 8, and 9
Oracle Linux7, 8, and 9
CentOS7
Google Container Optimized OS (default on GKE) (Preview)93 and higher

Notes:

  • Custom kernel builds are not supported.
  • The Workload Protection eBPF-less solution for eBPF disabled environments uses a ptrace-based Datadog Agent. The ptrace-based Datadog Agent supports Linux kernel versions from 3.4.43 to 4.9.85.
  • For compatibility with a custom Kubernetes network plugin like Cilium or Calico, see Troubleshooting Workload Protection.
  • Data collection is done using eBPF, so Datadog requires, at minimum, platforms that have underlying Linux kernel versions of 4.14.0+ or have eBPF features backported (for example, Centos/RHEL 7 with kernel 3.10 has eBPF features backported, so it is supported).
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers